Existing Likely

Nebius Kansas City Phase 1

Nebius AI • United States of America • April 15, 2025
Total GPUs
4.0K
H100 Equiv
4.0K
Power
5.0 MW
FP16
4.0K PF

System Equivalents

This datacenter's 4.0K GPUs equal:

NVIDIA HGX H200 (8-GPU)
8 GPUs/system
500
NVIDIA HGX H200 (4-GPU)
4 GPUs/system
1.0K

Specifications

Primary GPUNVIDIA H200 SXM
GPU Count4.0K
LocationKansas City, USA
SectorPrivate

Additional Information

will house thousands of state-of-the-art NVIDIA GPUs, primarily NVIDIA Hopper GPUs in the initial phase, with the energy-efficient NVIDIA Blackwell platform expected to arrive in 2025. The colocation can be expanded from an initial 5 MW up to 40 MW, or about 35 thousand GPUs, at full potential capacity

Current power is 5MW our of potential expansion to 40MW (which would host 35k GPUs), so extrapolating, that would put it at ~4k GPUs They claimed that it was on track to go live in Q1 2025 in March 2025, implying that it likely came online soon after March