Existing Confirmed
NVIDIA Eos Phase 1
NVIDIA • United States of America • May 22, 2023
Total GPUs
1.0K
H100 Equiv
1.0K
Power
1.5 MW
FP16
1.0K PF
System Equivalents
This datacenter's 1.0K GPUs equal:
NVIDIA DGX H100
8 GPUs/system
128
NVIDIA HGX H100 (8-GPU)
8 GPUs/system
128
NVIDIA HGX H100 (4-GPU)
4 GPUs/system
256
Specifications
| Primary GPU | NVIDIA H100 SXM5 80GB |
| GPU Count | 1.0K |
| Location | United States of America |
| Sector | Private |
Additional Information
Nvidia’s new “Pre-Eos 128 Node DGX SuperPOD” is another one we’ve been waiting to hear word on.... In its full configuration, Eos will span 18 32-DGX H100 Pods, for a total of 576 DGX H100 systems, 4,608 H100 GPUs
Full system = 4608 GPUs Pre system = (128/576)x4608 = 1024