Existing Confirmed
NVIDIA Israel-1 Phase 1
NVIDIA • Israel • November 23, 2023
Total GPUs
1.0K
H100 Equiv
1.0K
Power
1.5 MW
FP16
1.0K PF
System Equivalents
This datacenter's 1.0K GPUs equal:
NVIDIA DGX H100
8 GPUs/system
128
NVIDIA HGX H100 (8-GPU)
8 GPUs/system
128
NVIDIA HGX H100 (4-GPU)
4 GPUs/system
256
Specifications
| Primary GPU | NVIDIA H100 SXM5 80GB |
| GPU Count | 1.0K |
| Location | Israel |
| Sector | Private |
Additional Information
The first phase includes Dell PowerEdge XE9680 servers based on 128 Nvidia HGX H100 systems will feature 256 Nvidia HGX H100 systems, combining 2,048 Nvidia H100 80GB GPUs with more than 34 million CUDA cores and 1 million fourth-generation Tensor Cores, 2,560 BlueField-3 DPUs, and 80 Spectrum-4 switches