AI GPU Datacenter Infrastructure Portfolio
Total Datacenters
3
Total GPUs
1.1M
H100 Equiv
2.8M
Power (MW)
2500.0
Status
0 / 3
Existing / Planned
Locations (1 Country):
GPU Types (2):
NVIDIA GB200NVIDIA B200
All Datacenters (3)
"OpenAI/Microsoft Mt Pleasant, Wisconsin Phase 2"
PlannedUnited States of America
GPUs
700.0K
NVIDIA GB200
H100 Equiv
1.8M
M39X+XG, Mt Pleasant, WI 53177
OpenAI/Microsoft Atlanta
PlannedUnited States of America
GPUs
300.0K
NVIDIA B200
H100 Equiv
682.2K
1435 Hwy 54 W, Fayetteville, GA 30214
"OpenAI/Microsoft Mt Pleasant, Wisconsin Phase 1"
PlannedUnited States of America
GPUs
150.0K
NVIDIA GB200
H100 Equiv
379.0K
M39X+XG, Mt Pleasant, WI 53177