- Eni HPC4 Phase 2
Existing Confirmed
Eni HPC4 Phase 2
Eni • Italy • October 30, 2021
Total GPUs
250
H100 Equiv
78
Power
2.0 MW
FP16
422 PF
System Equivalents
This datacenter's 250 GPUs equal:
NVIDIA DGX A100
8 GPUs/system
31
NVIDIA HGX A100 (8-GPU)
8 GPUs/system
31
Specifications
| Primary GPU | NVIDIA A100 |
| GPU Count | 250 |
| Location | Via per la Corradina, 35, 27032 Ferrera Erbognone PV, Italy |
| Sector | Private |
Additional Information
Comprising the bulk of the system, there are 1,375 nodes that house two Nvidia “V100 O&G” GPUs; 125 nodes have two Nvidia A100s