Oracle • United States of America • November 15, 2023
Total GPUs
32.8K
H100 Equiv
10.3K
Power
27.2 MW
FP16
10.2K PF
System Equivalents
This datacenter's 32.8K GPUs equal:
NVIDIA DGX A100
8 GPUs/system
4.1K
NVIDIA HGX A100 (8-GPU)
8 GPUs/system
4.1K
Specifications
| Primary GPU | NVIDIA A100 |
| GPU Count | 32.8K |
| Sector | Private |
Additional Information
OCI Supercluster networking can now scale up to 4,096 OCI Compute Bare Metal instances with 32,768 A100 GPUs
Unclear exactly when this first became operational, if it was ever built. The announcement March 2023 states Oracle OCI can now scale to 32k A100s, but it's unclear whether this implies that a 32k A100 cluster has already been built, or just that they have the capacity to build one. It seems likely that a cluster of this size was built, but there's little direct evidence for this. I estimate Q4 2023 to be slightly conservative on the timing for when it was first operational.
Related Datacenters
OpenAI Stargate Abilene Oracle OCI Supercluster Phase 3
5.1M H100 equiv
PlannedOpenAI Stargate Abilene Oracle OCI Supercluster Phase 2
758.0K H100 equiv
PlannedOracle OCI Supercluster B200s
298.0K H100 equiv
PlannedOpenAI Stargate Abilene Oracle OCI Supercluster Phase 1
252.7K H100 equiv
PlannedOracle OCI Supercluster H200s
65.5K H100 equiv
Existing