Planned Likely

Microsoft Sweden Sandviken

Microsoft • Sweden
Total GPUs
6.7K
H100 Equiv
6.7K
FP16
6.6K PF

Specifications

LocationGamla Tunavägen, 811 42 Sandviken, Sweden
SectorPrivate

Additional Information

Microsoft said it will place more than 20,000 graphic processing units (GPUs) at its data centers in Sandviken, Gävle, and Staffanstorp

The "Reported Manual Flop/s" column is the number of INT8 FLOPs that this cluster could do assuming it was using (20k/3) GPUs, and they were all H100s. I assume that the true FLOP/s number will be higher as I assume they will likely use some Blackwell chips. Unclear how many GPUs will be in each of the three stated data centers, so this (20k/3) is a lower bound on how large the largest cluster must be. Also, it is unclear what type of GPUs will be used (though presumable some H100s and Blackwells).