Existing Likely

NVIDIA Israel-1 Phase 2

NVIDIA • Israel • November 20, 2024
Total GPUs
2.0K
H100 Equiv
2.0K
Power
2.9 MW
FP16
2.0K PF

System Equivalents

This datacenter's 2.0K GPUs equal:

NVIDIA DGX H100
8 GPUs/system
256
NVIDIA HGX H100 (8-GPU)
8 GPUs/system
256
NVIDIA HGX H100 (4-GPU)
4 GPUs/system
512

Specifications

Primary GPUNVIDIA H100 SXM5 80GB
GPU Count2.0K
LocationIsrael
SectorPrivate

Additional Information

will feature 256 Nvidia HGX H100 systems, combining 2,048 Nvidia H100 80GB GPUs with more than 34 million CUDA cores and 1 million fourth-generation Tensor Cores, 2,560 BlueField-3 DPUs, and 80 Spectrum-4 switches

Not totally sure when this became operational, but it seems like it was at least operational by November 2024