Existing Likely
NVIDIA Israel-1 Phase 2
NVIDIA • Israel • November 20, 2024
Total GPUs
2.0K
H100 Equiv
2.0K
Power
2.9 MW
FP16
2.0K PF
System Equivalents
This datacenter's 2.0K GPUs equal:
NVIDIA DGX H100
8 GPUs/system
256
NVIDIA HGX H100 (8-GPU)
8 GPUs/system
256
NVIDIA HGX H100 (4-GPU)
4 GPUs/system
512
Specifications
| Primary GPU | NVIDIA H100 SXM5 80GB |
| GPU Count | 2.0K |
| Location | Israel |
| Sector | Private |
Additional Information
will feature 256 Nvidia HGX H100 systems, combining 2,048 Nvidia H100 80GB GPUs with more than 34 million CUDA cores and 1 million fourth-generation Tensor Cores, 2,560 BlueField-3 DPUs, and 80 Spectrum-4 switches
Not totally sure when this became operational, but it seems like it was at least operational by November 2024