
Lenovo Lenovo NVIDIA GB300 NVL72
Lenovo's build of NVIDIA's GB300 NVL72, a 48U MGX rack holding 72 Blackwell Ultra GPUs and 36 Grace CPUs across eighteen 1U compute trays, with nine switch trays and either six or eight power shelves joined by a rear cable cartridge backplane. Two rack base options exist, C5RK with non-redundant power and six shelves and C5RJ with redundant power and eight; they differ only in power, not in compute. Cooling is deliberately hybrid rather than fully liquid: CPUs, GPUs and the NVSwitches are liquid cooled while the OSFP modules, drives and power distribution board are air cooled, which Lenovo puts at roughly 90 percent of rack heat captured to liquid and 10 percent to air, and which lets the whole thing drop into a standard 19 inch cabinet. Each rack consumes 135 kW of thermal design power, rising to about 155 kW at peak depending on workload. Each compute tray carries two Grace processors of 72 Arm Neoverse V2 cores with up to 960 GB of LPDDR5x between them, up to eight E1.S NVMe drives and an M.2 boot device. Lenovo publishes no accelerator memory total and no throughput figure; the memory it does state is the Grace side rather than HBM.
We will point you at suppliers who have it. Free, and no signup.
Systems built on this design
3 configurationsBuilt on the NVIDIA GB300 NVL72 baseboard, so accelerator performance matches the reference. Chassis, CPU, memory and cooling are this vendor's own.
System Details
GPU Configuration
System Specifications
Powered by NVIDIA GB300
This system utilizes 72 × NVIDIA GB300 NVL72 GPU 288GB GPUs, each delivering exceptional performance for AI and HPC workloads.
Per GPU TDP
—
Per GPU Memory
288 GB
Process Node
4nm
Architecture
Blackwell Ultra
Frequently asked questions
How much does the Lenovo NVIDIA GB300 NVL72 cost?
Lenovo sells the Lenovo NVIDIA GB300 NVL72 on quote through OEMs and resellers, and nobody rents a whole one by the hour. Renting its 72 GB300 accelerators separately at the cheapest live rate Flopper tracks, $13.72 per GPU-hour across 2 providers, comes to about $988 an hour for the equivalent capacity. GB300 rental prices →
How much power does the Lenovo NVIDIA GB300 NVL72 require?
Lenovo rates the Lenovo NVIDIA GB300 NVL72 at 135 kW, which is the figure to plan power delivery and cooling around; per-GPU draw is listed on the accelerator's own page.
How many GPUs are in the Lenovo NVIDIA GB300 NVL72?
72. The Lenovo NVIDIA GB300 NVL72 carries 72 NVIDIA GB300 NVL72 GPU 288GB accelerators in a rack form factor, and every throughput figure on this page is the total across them. GB300 specifications →
Documentation & Resources
Need this system?
Tell us the quantity, timeframe and region. We reply by email with who can supply it.
Flopper Spec Sheet
Lenovo Lenovo NVIDIA GB300 NVL72 specifications, generated from our database. Printable.
Vendor product page
Lenovo Lenovo NVIDIA GB300 NVL72 documentation
Lenovo ThinkSystem SR685a V3 Server Product Guide (LP1910)
Lenovo • Latest version
Typical Use Cases
The Lenovo Lenovo NVIDIA GB300 NVL72 runs 72× GB300 GPUs over Fifth-generation NVLink across all 72 GPUs through nine switch trays, joined by a rear cable cartridge backplane; the NVLink domain is contained within one rack, with no inter-rack scaling, and each compute tray adds up to three PCIe Gen 5 x16 slots for networking.